Continued work on cleaning up wiring. Updated spreadsheet with connections that were tested. Worked on routing of wires to engine bridge, regulator and fuse and ground blocks. Rerouted wires to GAD 27 TB273. Ready to drill a hole for a new clamp and make all the fuse block connections.